MBTA Ashmont - Mattapan Line: Traction Volume One

MBTA Ashmont - Mattapan Line: Traction Volume One (2023)

TMDb

0.0

01/01/2023 • 0h 35m
original-title

MBTA Ashmont - Mattapan Line: Traction Volume One

status

Released

production-companies

Blackstone River Productions

original-language

English

budget

-

revenue

-

The Ashmont-Mattapan High Speed Line operates 2.6 miles of track from Ashmont Station to Mattapan Station just south of Boston. We capture this neat little commuter operation in the state of Massachusetts. They operate with all PCC trolley cars! This operation offers a vital link to commuters to get to Boston easily from the suburbs of Boston! It is a landlocked line that connects with the Red Line at Ashmont Station! Filmed in 2022 & 2023 at 7 of the 8 stations.

production-countries

United States of America

spoken-languages

English

Reviews

loading-reviews